HOUSTON, TEXASU.S. & international enquiries
Request Quote

TUBULARS / OCTG / SOURCED TO SPECIFICATION

Casing

Casing enquiries specified by diameter, weight, grade, connection and required length.

Sourcing enquiryConfiguration reviewed to order

EQUIPMENT OVERVIEW

A requirement-led approach.

Casing is specified as part of the well construction program. A sourcing enquiry should capture the complete pipe designation and delivery scope, with no assumption that grade or connection can be substituted.

Send the casing schedule with outside diameter, weight or wall thickness, required grade, connection and length requirements. State quantity by joints or total length and identify any accessories as separate line items.

Include inspection, marking, traceability and documentation requirements. Any proposed alternative connection or grade requires the buyer's engineering review and explicit acceptance.

Applications

  • Well construction casing procurement
  • Project casing schedules
  • Specified replacement or additional tubular requirements

DEFINE YOUR REQUIREMENT

Technical configuration

Tell us the configuration your application requires. The fields below describe buyer inputs, not fixed product specifications.

Outside diameter
Specify in your RFQ
Weight per unit length or wall thickness
Specify in your RFQ
Required material grade
Specify in your RFQ
Connection and coupling requirements
Specify in your RFQ
Length requirements and total quantity
Specify in your RFQ
Inspection, traceability and destination
Specify in your RFQ

Availability and suitability depend on the selected equipment and supplier. Proposed alternatives require your review.

Standards & requirements

Identify any API 5CT requirement and required edition, together with your connection and inspection specifications. No grade or certification is assumed.

SUPPORTING RECORDS

Documentation to request

List the records you need with your RFQ. Supplier availability, traceability and document scope must be confirmed before order.

  • Mill or material test records, if available and required
  • Requested dimensional and inspection records
  • Pipe tally, marking and packing information for supplier confirmation
How our procurement process works
Have an equipment requirement? Request Quote