EQUIPMENT OVERVIEW
A requirement-led approach.
A wellhead enquiry should identify the required assembly and its interfaces with the casing, tubing and equipment above it. Individual heads, hangers, spools and adapters need to be specified in the context of that arrangement.
Send the wellhead schematic or bill of materials, pressure and temperature requirements, and the relevant material and service classes. Mark whether the requirement is for a complete package or selected components.
For an existing installation, provide manufacturer references and mating dimensions. Proposed equipment, documentation and any deviation from the enquiry are subject to review before purchase.
Applications
- Well construction equipment procurement
- Completion wellhead requirements
- Replacement wellhead components
DEFINE YOUR REQUIREMENT
Technical configuration
Tell us the configuration your application requires. The fields below describe buyer inputs, not fixed product specifications.
- Wellhead arrangement and scope of supply
- Specify in your RFQ
- Casing and tubing program
- Specify in your RFQ
- Pressure, temperature and service requirements
- Specify in your RFQ
- Connections and mating equipment details
- Specify in your RFQ
- Required material and performance requirements
- Specify in your RFQ
- Inspection and documentation scope
- Specify in your RFQ
Availability and suitability depend on the selected equipment and supplier. Proposed alternatives require your review.
Standards & requirements
Identify any API 6A requirement, required edition and project-specific acceptance criteria. Compliance is subject to review of the proposed supplier and equipment documentation.
SUPPORTING RECORDS
Documentation to request
List the records you need with your RFQ. Supplier availability, traceability and document scope must be confirmed before order.
- General arrangement or component drawings, if available
- Material and inspection records required by the project
- Pressure-test and conformity records, subject to supplier confirmation
