HOUSTON, TEXASU.S. & international enquiries
Request Quote

WELL CONTROL / SOURCED TO SPECIFICATION

Ram Blowout Preventers

Ram BOP enquiries matched to the required ram function, bore and operating conditions.

Sourcing enquiryConfiguration reviewed to order

EQUIPMENT OVERVIEW

A requirement-led approach.

Ram blowout preventers use a defined ram arrangement within the preventer body. The required ram function and the tubular configuration must be specified together; different ram types serve different purposes.

Include the required bore, working pressure, number of cavities and ram configuration in your enquiry. Where a shearing function is requested, supply the full tubular details and your acceptance requirements for manufacturer review.

For replacement units or rams, send the original equipment identification and drawings. Compatibility, operating capability and any proposed substitutions need documented confirmation before an order is placed.

Applications

  • Drilling BOP assemblies
  • Workover equipment procurement
  • Ram preventer replacement requirements

DEFINE YOUR REQUIREMENT

Technical configuration

Tell us the configuration your application requires. The fields below describe buyer inputs, not fixed product specifications.

Bore and working pressure
Specify in your RFQ
Number of cavities and required ram functions
Specify in your RFQ
Tubular outside diameter and full pipe details where relevant
Specify in your RFQ
Connection arrangement
Specify in your RFQ
Control and locking requirements
Specify in your RFQ
Service conditions and inspection scope
Specify in your RFQ

Availability and suitability depend on the selected equipment and supplier. Proposed alternatives require your review.

Standards & requirements

State whether API 16A applies, including the required edition and project requirements. Supplier compliance and any licensing must be verified for the proposed equipment.

SUPPORTING RECORDS

Documentation to request

List the records you need with your RFQ. Supplier availability, traceability and document scope must be confirmed before order.

  • Manufacturer configuration and ram identification, if available
  • Required functional and pressure-test records for supplier review
  • Dimensional drawings and material traceability, where required and available
How our procurement process works
Have an equipment requirement? Request Quote